DIMENSIONS

Heater blowers LC
L
Model
L
H
16
555 485 300 230
20
630 560 300 230
28
780 710 300 230
40
630 1010 300 230
56
780 1310 300 230
P
Ø
H
P
B
Ø
Weight Kg.
G 1"
G 1"
G 1"
G 1"
G 1"

4.0 INSTALLATION

4.1 GENERAL INFORMATION - POSITIONING

Before carrying out any installation work, ensure that
the following conditions are met:
a) it is possible to arrive in the desired place with the
single-phase power supply line 230Volts ~ 50
Hz and that the expected position of plumbing
connections matches that of the attacks on the
unit.
b) that the location is suitable for proper air circulation
in the environment and the air flow is not impeded
by any obstacles, otherwise, that the air flow itself
does not disturb the people present. In the case in
which in the same room are installed several
devices, it is convenient to distribute the air
according of opposite flow directions;
B
c) that the installation location allows accessibility to
the appliance parts subject in maintenance.
The optimal installation height is between 2.4
and 3.5 m and is understood as the vertical
distance between the decking and the base
station; higher or lower heights than indicated
should be carefully evaluated so as to ensure the
correct air distribution within the room.

4.2 WATER CONNECTIONS

WARNING! Make sure the bearing capacity of the
wall on which it will be fixed the support bracket,
depending on the weight of the device and to
install the fasteners.
WARNING! Verify the characteristics of the water
circulation device with the load losses of the
batteries of the related equipment
In case you are used metal pipes, it is recommended
to follow the following requirements:
- install air vent valves at the highest points of the
pipes;
- to install on-off valves on pressure lines and
return water to facilitate the maintenance
operations avoiding to download the whole
system;
- suitably insulate the pipes to prevent heat loss
30
and condensation.
34
WARNING! Before filling the pipes, make sure
38
they do not contain material outsider like sand,
debris, rust and anything can damage the unit
63
exchanger or reduce the yield.
75