Reset Button; Power Supply; Hardware Installation; Sim Card Installation - LINOVISION IOT-CPE5G Quick Start Manual

Table of Contents

Advertisement

2.5 Reset Button

Description
Function
STATUS & 5G LED
Static
Reset
Static → Blinking
Off → Static Green

3. Power Supply

IOT-CPE5G can be powered by 802.3af standard PoE or 9-48VDC.
at the same time.
PoE Supply: Follow the below picture to provide power supply via PoE injector. Besides, IOT-CPE5G
can also be powered by PoE switch.
DC Supply: Connect the DC power cable to terminal block, then connect the terminal block to DC
interface to power the device.

4. Hardware Installation

4.1 SIM Card Installation

Insert the SIM card into the device according to the direction icon on the device. If you need to take out
the SIM card, press into the SIM card and it will pop out automatically.
Action
Press and hold the reset button for more than 5 seconds.
Release the button and wait.
The device resets to factory default.
Both power supplies can't be used
7

Advertisement

Table of Contents
loading

Table of Contents