Download Print this page

Eberg MEZO M26HD Instruction Manual page 39

Advertisement

Available languages

Available languages

EN
MEZO
6. OPERATION INTRODUCTION
Before starting operations in this section:
1) Find a place where there is power supply nearby.
2) Install the exhaust ducts as shown in the figure below, and adjust the positions
of the mounting plates and windows.
3) Insert the power cord into an grounded AC220V/50Hz socket;
4) Press the POWER button to turn on the air-conditioner.
Before Using Notice:
1. Operation temperature range:
Minimum cooling
Cooling
Heating
Maximum cooling
18°C
Min temp
7°C
39
35°C
Max temp
27°C
www.eberg.eu

Advertisement

loading