Dear Customer, Thank you for wanting to learn about a product Aermec. This product is the result of many years of experience and in-depth engineering research, and it is built using top quality materials and advanced technologies. The manual you are about to read is meant to present the product and help you select the unit that best meets the needs of your system.
Weight distribution..............................12 Hydraulic connections ............................. 13 Water features ..............13 Hydraulic circuits ............................... 14 Internal and external hydraulic circuit NYB ..14 Water features ..............14 Electrical connections .............................. 15 Electrical data of the unit ...........16 Electric power connection to the electrical mains ..................17 Commissioning - warnings ............................
An accidental release of refrigerant may cause risk of suffocation currently in force. Assess the procedures Aermec requires and due to a lack of oxygen: install the machine in a well ventilated...
Page 7
Install the unit at a distance enough from the exhaust wells, to ensure The machine and the pipes have very hot and very cold surfaces that that the possible loss of gas may reach and pollute the aquifer lead to risk of burns Keep all lubricants in properly marked containers do not keep Before opening a machine panel, ascertain whether it is or not firmly flammable liquids near the plant...
- Check that the equipment supplied corresponds to the order and delivery note Product identification The Aermec products can be identified by the packaging label bearing the identification data of the product and by the technical plate bearing the performance and technical data of your unit.
Whenever the machine must be lifted using belts, place protections between the belts and the framework to prevent damage to the structure. The NYB units are supplied with eyebolts; they must be lifted using suitable straps hooked to all the installed eyebolts.
ATTENTION: The use of anti-vibration supports MUST be combined with the installation in the unit water piping of flexible couplings. The anti- vibration supports must be fixed to the unit BEFORE it is earthed. AERMEC is not responsible for the choice of capacity of the anti-vibration supports.
The water inlet and outlet connections are indicated in the dimension tables in this manual, or available on www. aermec.com It is important to follow the recommendations (not complete) below: •...
ELECTRICAL CONNECTIONS ELECTRICAL CONNECTIONS The units are completely wired at the factory and only require connection ATTENTION to the electric power supply mains, downstream from a unit switch, • All the electrical operations must be carried out by personnel in possession of the necessary qualifications by law, suitably trained and according to that envisioned by the Standards in force on this subject in the informed on the risks related to these operations.
ELECTRIC POWER CONNECTION TO THE ELECTRICAL MAINS ELECTRIC POWER CONNECTION TO THE ELECTRICAL MAINS • Open the external covering panels (if present) • For the functional connection of the unit, take the power supply • Make sure that the switch is at “OFF” before opening the electric cable to the electric control board inside the unit and connect it to control board for the connection of the unit to the power supply.
COMMISSIONING - WARNINGS COMMISSIONING - WARNINGS Please note that, on request by the Aermec customer or the legitimate COMMISSIONING owner of the machine, the units in this series can be started up by Once all the aforementioned checks have been carried out, the unit...
MAINTENANCE MAINTENANCE ATTENTION place before restarting the unit; Any cleaning, inspection, control, routine and extraordinary mainte- It is not permitted to walk or place other bodies on the machine; nance must be performed by experienced, authorised personnel and Fans, motors and belt drives may be in motion, always wait for them qualified to perform the above tasks.
Page 20
Always and only use original spare parts purchased directly from Aer- if these devices intervene, the refrigerant gas is released at high mec or from official dealers. Contact Aermec should it be necessary temperature and speed; to move the unit one year after its positioning on-site or it must be The machine and the pipes have very hot or very cold surfaces that lead to risk of burns by contact;...
Page 21
With machine off, access its cooling circuit; The high/low pressure switch, where present must be tested with the Connect the necessary instruments, machine “closed”, reading the high pressure circuit pressure on the machine • Pressure gauges connected through appropriate extensions to the control panel.
MAINTENANCE - LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS MAINTENANCE - LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS RECOMMENDED PERIODIC MAINTENANCE INTERVENTIONS FREQUENCY DESCRIPTION functioning hours months months months months GENERAL INTERVENTIONS Check of any refrigerant leaks (this must be done respecting the deadlines recommend- •...
Page 23
MAINTENANCE - LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS RECOMMENDED PERIODIC MAINTENANCE INTERVENTIONS TO UNITS WITH CENTRIFUGAL COMPRESSORS FREQUENCY DESCRIPTION 6 months 12 months other GENERAL CHECKS Check that the compressor is not damaged • Check that there are no excessive vibrations induced by other operating components •...
Page 24
DOWNLOAD THE LATEST VERSION: http://www.aermec.com/qrcode.asp?q=15621 A E R M E C S . p . A . V i a R o m a , 9 9 6 - 3 7 0 4 0 B e v i l a c q u a ( V R ) - I t a l y P h o n e .
Need help?
Do you have a question about the NYB and is the answer not in the manual?
Questions and answers