External Wiring; Initial Operation & Power Up - Ideal Heating i305 Installation & Servicing

Pod heat interface unit
Table of Contents

Advertisement

2.10 EXTERNAL WIRING

Electrical Installation
1. Checks to ensure electrical safety should be carried out by
a competent person.
2. ALWAYS carry out the preliminary electrical system checks,
i.e. earth continuity, polarity, resistance to earth and short
circuit, using a suitable test meter.
IT IS A CONDITION OF THE MANUFACTURER'S WARRANTY THAT THE
2.11 INITIAL OPERATION & POWER UP
A
After initial power-up of the HIU the controls will initialise and display information about unit type and power output.
The first screen will show the HIU type as 'II' (Indirect/Indirect), or 'dl' (direct/Indirect). The second screen will
show the DHW output (30kW, 40kW, 50kW, 60kW or 70kW). The HIU controls can now be used to electronically
open / close the primary control valves to allow for commissioning and balancing of the primary network and the
commissioning engineer can input all the relevant parameters to provide efficient operation of the HIU and the Heat
Network.
22
SECTION 2 - INSTALLATION
ATTENTION !
COMMISSIONING CHECKLIST IS FULLY COMPLETED
AND LEFT WITH THE APPLIANCE
E
B
C
D
G
F
Legend
A. Reset Button
B. - Function Button
C. + Function Button
D. Menu Button
E. HIU Status Display
F. CH System Pressure Gauge
(Indirect Only)
G. Heat Meter (Optional)
Installation and Servicing

Advertisement

Table of Contents
loading

This manual is also suitable for:

I405I505I605I705D30D40 ... Show all

Table of Contents