Download Print this page

OLT GardenSaver GS84D-Plywood Assembly Manual page 25

8x4 garden shed with double door and plywood roof

Advertisement

48.
Attach Corner Filler Trims where gaps exist in rear corners (2 per side). Hammer with 8 - 1 1/2"
finishing nails. Position bottom filler just below wall siding. Top filler just below soffit. Gap in middle.
49.
Position and attach Corner Filler Trims in the front as per Step 52. There is an additional 10" long
Front Center Corner Filler Trim that you will need to center and attach as well using 2 - 1 1/2" nails.
Vertical
Door Trim.
50.
Locate Vertical Door Trim (2 - 1/2" x 3 1/2" x 77 1/2"). Position Door Trim flush with outside of
narrow wall stud. Trim should be aligned just beneath Door Header. Attach with 8 - 1 1/2" finishing nails.
Toll Free 1-888-658-1658
Flush with
Narrow Wall
Flush with
stud.
bottom of
Door Header.
www.outdoorlivingtoday.com
Page 25
sales@outdoorlivingtoday.com
Gaps to be
covered.

Advertisement

loading