Travel; What Must Be Done Before Taking Into Operation - Volvo L20B Owner's Manual

Table of Contents

Advertisement

What must be done before taking into operation?

M200048A
max
min
M300038A
M200049A

Travel

What must be done before taking
into operation?
Fuel tank
– The fuel tank should be filled at the end of each work day. This
almost prevents the formation of any condensation water.
– The fuel tank should never be "run dry".
– Fill in only clean fuel!
ATTENTION!
BE CAREFUL with fire and open light!
DANGER OF EXPLOSION!
– Watch the fuel level gauge.
Checking the engine oil level
– Park the machine on level ground.
– Shut the engine down.
– Open the engine hood.
– Pull the dipstick out, wipe it clean with a lint-free cloth, reinsert
it until it bottoms and pull it back out.
– The dipstick should generally be covered with oil up to the
upper mark.
– Top up oil if necessary.
– For quality of oil refer to the lubrication chart.
Checking the oil level in the travel, working and
steering hydraulics
– The above mentioned assembly groups have a common oil
household.
– With the loading equipment lowered the bottom oil level inspec-
tion glass must be filled, the top oil level inspection glass must
not show any oil.
Note:
With increasing oil temperature (max. 80 °C / 176 °F) the oil level
may raise up to the middle of the upper oil level inspection glass.
Travel
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents