Installing Pf5820; Required Tools; Package Contents; Environmental Requirements - NEC PF5820 Installation Manual

Table of Contents

Advertisement

ポイント
Chapter 2. Installing PF5820
This chapter describes how to install and initialize PF5820.

Required tools

You need the following tools or equipment to install PF5820:
• Standard flat-blade screwdriver
• #2 Phillips screwdriver
• Electrostatic discharge wrist strap

Package contents

The basic PF5820 package contains the following items:
• PF5820 switch unit (one of the following):
- PF5820F (front-to-rear airflow)
- PF5820R (rear-to-front airflow)
• Standard rack mount kit
- Two brackets
- Screws to attach brackets to the switch unit
- Screws to attach the switch unit to the equipment rack
• Mini-USB to RJ-45 serial cable, category 5 patch cable, RJ-45 to DB9 adapter
• Two ac power cords

Environmental requirements

This section describes the basic environmental requirements for PF5820.
Make sure the location where you install the switch meets the following
requirements:
• Install the switch unit in a dry, clean, well-ventilated area.
• Provide adequate space in the front and back of the switch unit, to ensure proper
air flow.
• Make sure that an adequate grounded power supply is within reach of the switch
unit.
• Make sure that twisted-pair cable is routed away from power lines, fluorescent
lighting fixtures and other sources of electrical interference.

Preventing electric shock

This product does not contain any user-serviceable parts. Do not remove the cover
of this device.
PF5820 ac power model is designed to work with single-phase power systems
that have a grounded neutral conductor. To reduce the risk of electric shock, always
plug the power cord into a grounded power outlet.
.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents