Download Print this page
GoFit GF-ECS Assembly Instructions

GoFit GF-ECS Assembly Instructions

Elevated chin up station
Hide thumbs Also See for GF-ECS:

Advertisement

Quick Links

Parts visual references
For questions or missing parts, please contact GoFit at 888-530-4441
ELEVATED CHIN UP STATION
ASSEMBLY INSTRUCTIONS
Tools required:
Parts
-Adjustable Wrench
HOLES ALLOW FOR
THREE HEIGHT OPTIONS
Prior to assembly, confirm that
all parts are included in the box:
-2 Side Bars (C-shaped)
-1 Curved Bar (2 halves)
-1 Straight Bar (2 halves)
-1 Leverage Bar
-2 Eyebolts
-2 Self-seating Bolts
-2 Long Hex Bolts
-2 Short Hex Bolts
-8 Lock Washers
-8 Lock Nuts
-1 Door Molding Wedge
(32 Total Pieces)
©2017 GOFIT, L.L.C. TULSA, OK
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the GF-ECS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GoFit GF-ECS

  • Page 1 -2 Eyebolts -2 Self-seating Bolts -2 Long Hex Bolts -2 Short Hex Bolts -8 Lock Washers -8 Lock Nuts -1 Door Molding Wedge (32 Total Pieces) For questions or missing parts, please contact GoFit at 888-530-4441 ©2017 GOFIT, L.L.C. TULSA, OK...
  • Page 2 Curved Bar. Place Lock Washer on Bolt; Curved Bar with holes in Side Bars; thread on Lock Nut. Finger-tighten. thread on Lock Nut. Finger-tighten. slide Eye Bolts through holes as shown. For questions or missing parts, please contact GoFit at 888-530-4441 ©2017 GOFIT, L.L.C. TULSA, OK...
  • Page 3 Leverage Bar securely the two side door frame moldings. frame molding on other side of doorway. rests on top of door frame molding. For questions or missing parts, please contact GoFit at 888-530-4441 ©2017 GOFIT, L.L.C. TULSA, OK...
  • Page 4 Wedge helps keep the Leverage Bar resting on the door frame/molding. Before each exercise, always check that the Leverage bar is resting on the door frame/molding. For questions or missing parts, please contact GoFit at 888-530-4441 ©2017 GOFIT, L.L.C. TULSA, OK...