Appendix B Customer Checklist - GE Kelman Minitrans Installation Manual

Transformer oil dissolved gas and moisture monitor
Hide thumbs Also See for Kelman Minitrans:
Table of Contents

Advertisement

The following checklist details items that the customer must acquire prior to the
installation:
 Prepared, flat mounting surface (unless direct mounted using the cradle)—see
Section 7).
 Parts needed to fabricate a mounting stand (if the product mounting stand or
cradle has not been purchased)—see Section 7.
 Required number of stainless-steel tubing lengths of 6 m (20 ft) each (see
Section 8.3).
 Fittings to adapt the transformer supply valve to a ¼ in. female NPT fitting (see
Section 8.2).
 Fittings to adapt the transformer return valve to a ¼ in. female NPT fitting (see
Section 8.2).
 ¼ in. compression ball valve, if required (see Section 8.3).
 ¼ in. stainless steel compression unions (if the length of either tubing path
exceeds 6 m (20 ft)—see Section 8.3.
 Communications option tested and located at the installation site (see Section
11).
 Circuit capable of 90 V AC to 264 V AC, 47 Hz to 63 Hz with suitable overcurrent
protection as per local regulations (see Section 9).
 Wiring and/or conduit for connection between the terminals within the product
and to the external switch or circuit breaker. This must be performed by a
suitably qualified electrician in accordance with local wiring regulations (see
Section 9.1).
 Tools and supplies needed to complete the installation (see Appendix A).
MA-005 - Minitrans Installation Manual - Rev 4.5
Appendix B
Customer Checklist
13-Aug-20
Page 37 of 86

Advertisement

Table of Contents
loading

Table of Contents