Front Door Discharge Configurations; Front Door Discharge; Unloading Conveyor - Jay-Lor 2875 Operator's Manual

Table of Contents

Advertisement

If the shear bolt breaks, it must be replaced with the correct bolt specified by the
manufacturer. Refer to the 'Maintenance and Service Information' attached for details. For
convenience, spare shear bolts are supplied with the machine and are stored on the lower
rubber portion of the input guard.

FRONT DOOR DISCHARGE CONFIGURATIONS

Front Door Discharge

The front discharge door is
controlled
hydraulically
from the tractor. The door
is opened to allow feed out
of the mixing chamber
onto the conveyor.
The door can be raised to
any
position
up
to
maximum of 32 inches in
height. Use the door guide
markings to determine the
door opening height.
In most cases the door will
be opened fully to unload
the
mixed
ration.
However,
the
most
suitable
door
opening
height may be determined
in combination with the
speed of the conveyor and
the ground speed of the
machine when unloading.

Unloading Conveyor

The conveyor must be greased on a regular basis, as per the Maintenance Schedule. When
unloading the machine, engage the conveyor before opening the discharge door. The speed
of the conveyor can be adjusted to suit unloading requirements, by adjusting the flow control
on the tractor.
The conveyor has an adjustment to tighten or loosen the chain. There is an adjuster located
on both sides of the conveyor, at the end of the conveyor opposite to the hydraulic motor.
Use wrenches to tighten or loosen the tension on the conveyor chain.
'Maintenance and Service Information' for more details.
JAY • LOR
®
Operator's Manual
a
Figure 14 - Front Discharge Door and Guides.
- 30 -
Refer to the
Trailer Units - Models 2875 - 21000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

21000

Table of Contents