Land Pride QH20 Series Operator's Manual page 13

Hide thumbs Also See for QH20 Series:
Table of Contents

Advertisement

Section 1: Assembly & Set-Up
Implement Hook-Up to QH20
Go to page 8 for "Implement Hook-Up to QH05" and
page 9 for "Implement Hook-Up to QH15".
NOTE: Quick Hitch hook-up to tractor is required
before proceeding with implement hook-up.
!
DANGER
A crushing hazard exist between Quick Hitch and implement.
Do not allow anyone to stand between the Quick Hitch and
implement during hook-up operations. Never operate 3-point
lift controls while someone is directly behind the tractor or
near the implement.
!
CAUTION
Release Handles have areas where pinching can occur. Keep
hands, fingers, and other body parts away from the pivoting
areas of the release handles. Always use the handle grips.
Lower Hitch Pin Set-up
Refer to Figure 1-6:
1.
Two 890-938C lower bushings (#1) and roll pins (#2)
are in a bag nailed to the crate.
2. Install bushings (#1) onto lower hitch pins. Secure
bushings by inserting roll pins (#2) thru bushings (#1)
and hitch pins (#5) as shown. This will provide a
tighter and more secure mounting in the Quick Hitch
auto-lock hooks.
3. Continue with "Hook-up Without Floating Top
Links" at the bottom of this page.
Lower Clevis Pin Set-up
Refer to Figure 1-7:
1.
Two 890-938C lower bushings (#1) and roll pins (#2)
are in a bag nailed to the crate. Roll pins (#2) are not
required in this application.
2. Install flange bushings (#1) over implement hitch
pins (#6) or customer can supply 1 7/16" OD
bushings (#3) in lieu of flange bushing (#1). See
"QH20 Spare Bushings" on page 10.
3. Secure hitch pin (#6) with customer supplied
linchpin (#4).
4. Continue with "Hook-up Without Floating Top
Links" below.
Hook-up Without Floating Top Links
Refer to Figure 1-6 & Figure 1-7:
1.
Make certain implement's upper and lower hitch
pins are secured in their respective clevis.
2. Place Quick Hitch release handles in the down
position as shown.
3. Lower 3-point lift arms until auto-lock hooks are
below implement's lower bushings (#1 or #3) and
upper hook is below upper hitch point.
12/04/15
Table of Contents
4. Carefully back tractor to align auto-lock hooks under
implement's lower bushings (#1 or #3) and upper
hook below upper hitch point.
5. Slowly raise 3-point lift arms until auto-lock hooks
lock onto the implement's lower bushings (#1 or #3)
and upper hook captures implement's upper hitch
point.
IMPORTANT: Make certain lower hitch pins are fully
seated in the auto-lock hooks and captured with lock
arms above. Also, make sure upper hitch point is
captured in the Quick Hitch upper hook.
IMPORTANT: When hooking-up a driveline, make
sure it is not too short to comply with shaft
overlapping guidelines. Refer to your implement
Operator's Manual for driveline hook-up instructions.
Replace driveline shafts and shields if they are too
short. See your nearest Land Pride dealer for new
shafts and shields.
6. If required, follow implement guidelines for driveline
hook-up and required driveline length.
QH20 Hook-up to Implement With Lower Hitch Pins
QH20 Hook-up to Implement With Lower Clevis Pins
QH15 Category l Hitch, & QH20 Category ll Hitch Quick Hitches 320-003M
Figure 1-6
Figure 1-7
24877
24877
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qh15 seriesQh05 series

Table of Contents