Viessmann VITOLIGNO 250-S Operating Instructions Manual page 38

Wood gasification boiler for logs up to 50 cm or 100 cm long
Table of Contents

Advertisement

Prolonged heating system shutdown
Prolonged heating system shutdown
If you do not intend using your heating system for a
while, you can switch it off. We recommend you con-
tact your heating contractor before and after shutting
down the system for longer periods.
Your heating contractor can then take suitable steps,
such as ensuring frost protection for the system or
heating surface preservation.
Shutdown
1. Note
Only disconnect the mains plug of the boiler for
maintenance and repair purposes.
Otherwise the lambda probe will not be heated.
This can cause damage to the lambda probe dur-
ing longer shutdown periods.
The boiler circuit pump is switched on briefly at
regular intervals.
2. Complete the work in accordance with the "Mainte-
nance intervals" table on page 44.
3. If there is a risk of frost, drain the boiler. Observe
the instructions provided by your heating system
installer. Alternatively, you could ask them to add
antifreeze.
38
Note
No special measures are required for a temporary sys-
tem shutdown.

Advertisement

Table of Contents
loading

Table of Contents