Removing A Blade Server Cover - Cisco UCS B420 M3 Installation And Service Note

High performance blade server
Hide thumbs Also See for UCS B420 M3:
Table of Contents

Advertisement

Note
Due to technical limitations, if the server is running a Cisco UCS Manager version earlier than release
2.2(3a) with the 32-GB SD card, only 16-GB usable capacity is available (regardless of mirroring) in the
server.
Figure 6: SD Card Slots

Removing a Blade Server Cover

Procedure
Step 1
Press and hold the button down as shown in the figure below.
Step 2
While holding the back end of the cover, pull the cover back and then up.
Figure 7: Opening a B420 M3 Blade Server
Air Baffles
The air baffles shown below ship with this server; they direct and improve air flow for the server components. No tools are necessary
to install them. Place them over the DIMMs and align them to the standoffs.