Cisco UCS B420 M3 Installation And Service Note page 18

High performance blade server
Hide thumbs Also See for UCS B420 M3:
Table of Contents

Advertisement

Procedure
Step 1
To install a CPU in an empty socket, remove the protective cap that is intended to prevent bent or touched contact pins.
The pick and pull cap tool provided can be used in a manner similar to a pair of tweezers. Grasp the protective cap and
pivot as shown.
Figure 12: Protective Cap Removal
Step 2
Release the catch on the pick and pull tool by pressing the handle/button.
Step 3
Remove the new CPU from the packaging, and load it into the pick and place tool as follows:
a) Confirm that the pedestal is set up correctly for your processor. The pedestal ships configured with the markings
"LGA2011-R1" facing upward, and this is the correct orientation.
b) Place the CPU on the pedestal. The CPU corners should fit snugly at the pedestal corners and the notches should meet
the pegs perfectly.
c) Place the CPU pick and place tool on the CPU pedestal aligned with the A1 arrow pointing to the A1 registration mark
on the pedestal.
d) Press the button/handle on the tool to grasp the CPU.
18

Advertisement

Table of Contents
loading

Table of Contents