MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer's instructions will invalidate the warranty, but does not affect statutory rights.
Customer Name
Address
Cylinder Make and Model
Cylinder Serial Number
Commissioned by (print name)
Company Name
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system?
Has a strainer been cleaned of installation debris (if fitted)?
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
What is the hot water thermostat set temperature?
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
Time and temperature controls have been fitted according to CSA Standards and local codes?
What is the hot water temperature at the nearest outlet?
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed
UNVENTED SYSTEMS ONLY
Where is the pressure reducing valve situated (if fitted)?
What is the pressure reducing valve setting?
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
The tundish and discharge pipework have been connected and terminated according to CSA Standards and local codes?
Are all energy devices fitted with a cut out device?
ALL INSTALLATIONS
The hot water system complies with the appropriate CSA standards and local codes
The system has been installed and commissioned in accordance with the manufacturer's instructions
The system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including this Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
Telephone Number
Registered Operative ID Number
Telephone Number
psi
Yes
No
Yes
No
Yes
No
°C
l/min
Yes
°C
Yes
psi
Yes
No_________
Yes
Yes
No
Yes
Yes
Yes
Yes