Initialization - TP-Link DeltaStream DS-P7001-08 Installation Manual

Gpon optical line terminal
Table of Contents

Advertisement

Grounding Terminal
Ground Cable (18-14 AWG)
Caution:
The product can be powered by a DC power source such as accumulator cell and a power
supply server. The DC power supply should comply with EN 62368-1 2014 clause 5.4.2.3.2.3,
and the transient voltage shall be no more than 2500 V
For DC power supply, please note that the power wires and disconnecting device are not
included with our product. If needed, you can purchase them separately.
For DC power supply, the rating of the external overcurrent protective device shall not exceed
16 A.
3.4

Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically
to ensure the device functions properly. During this time, its LED indicators will respond as follows:
1. The PWR LED keeps on all the time.
2. The SYS LED flashes momentarily and turns off. After the initial process succeeds, the SYS LED
keeps on.
3. The port LEDs flash momentarily and turn off. Then the port LEDs start to indicate status of ports
normally.
Equipotential Bonding Cable
Grounding Bar
DeltaStream GPON Optical Line Terminal
.
peak
Connection
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents