Resistance/piston type automatic grease lubricator (16 pages)
Summary of Contents for iSHAN YGL-G
Page 1
Operation Manual 感謝您購買裕祥集中潤滑給油系統,為了適當使用而無問題,請您閱讀 本產品說明書並確遵指示。 Welcome on using an iSHAN centralized lubrication systems. Read this owner's manual before installing, operating or maintaining the product. Failure to follow the instructions and safety precautions in this owner’s manual could result in serious injury, death, or property damage.
Page 13
Index 1 Scope of application....................14 2-1.2 Before lubricant filling.................14 2-1.3 Control panel safety information..............15 2-1.4 Faults......................15 2-2Parts of lubrication unit..................15 2-3Lable instruction....................17 2-4 Installation......................17 2-4.1 Positioning and mounting................18 2-4.2 Filling......................18 2-4.3 Lubrication line connection.................18 2-4.4 Wiring and alarm..................19 2-4.5 Deaerating.....................
Page 14
(unit:second/minute/hour/count);The lubrication time can be set up from 1 to 999 (unit: second/minute). iSHAN default setting of time unit for interval is minute and for lubrication is second. The operator can adjust intermittence and lubrication time depends on the application.
Page 15
* In order to avoid disorders of the control panel, never let it have contact with water or oil. 2-1.4 Faults Only qualified, instructed specialists who are authorized by iSHAN may repair lubricators and must use the original spare parts 2-2Parts of lubrication unit...
Page 18
2-4.1 Positioning and mounting Installation holes for the attachment of the compact unit to the wall must be made in accordance with the stipulations of the section mounting dimensions. (Fig.2) The lubrication unit is attached to the intended mounting location using appropriate fastening materials.(Fig.3) The installation location should be spaced between 0.6m to 1.7m above the ground.
Page 19
Fig.6 Fig.7 Fig.8 Fig.9 Fig.10 2-4.4 Wiring and alarm Warning !! To prevent chance of serious injury, death or property damage, disconnect the product from main power supply before working on it. Install a fuse between the power supply and the product is strongly recommended! The electrical circuit diagram of the lubrication unit is affixed inside the unit and can be accessed by removing the cap.
Page 20
Wiring must comply with the electrical circuit diagram (Fig.9) of the lubrication unit affixed inside the unit. Otherwise, property damage or serious injury can occur. Then fix the cable gland to the housing (Fig.10) to prevent any pulling. After the electrical connection is finished, tighten the cable gland and fix the cover. Then turn on the power and the power indicator on the panel will lamp and start to pump if the electrical connection is correct.
Page 21
3-1 Control panel Indicator light of LUB.(Yellow) lubrication (Yellow) (Yellow)LUB. Increase of LUB. time Display of LUB. Key for add lubrication time Decrease of LUB. time Time Key for reduce Indicator light of INT. (Green) Display of INT. Decrease of INT. time Time Key for reduce intermittent Increase of INT.
Page 22
3-1.4 Operating mode setting Warning !! Only allow authorized person by iSHAN company to change default setting. The user only can adjust time for lubrication or intermittence. 3-1.5 Progressive distributor with piston detector A cycle switch (piston detector) can be installed to monitor the distributor functions.
Page 23
3-1.7 Instruction of lamp and alarm (1)Indicator of level switch:Indicator lamp is on when the contact closed and alarm activates. When the contact open, indicator lamp is off and alarm stop. (2)Cycle switch:Indicator lamp is on when number of cycles is not in the range of the user’s setting after discharging finished.
Page 24
(option). Remove the cap (Fig. 3) and refill with new clean lubricant. Warning! Never use used lubricant 4 Maintenance iSHAN centralized lubrication system is easy to maintain. Filling new clear grease is the best maintenance. 5 Faults / Troubleshooting Warning !...
Page 25
God. Any return must consult with iSHAN and obtain iSHAN’s approval before action. 7 Announcement Warning: iSHAN reserves the right to make content and technical changes without notice and it includes the manual. It is invalid to file a lawsuit against iSHAN in above changes. 25 - 27...
Page 26
8 Technical data 8-1 Specification YGL-G080(standard) Compact YGL-G120 YGL-G200 YGL-GA080 unit YGL-GA120 YGL-GA200 (standard) Voltage AC220V or 110V or 380V or DC24V YGL-G08/120/200 apply No.00/000 Permitted YGL-G120/200 W/spring loaded follower plant apply lubricant No.0/00/000/1. Max. 16 ml/min discharge Max. output 100 kgf/cm pressure Output...
If you have technical queries, please contact one of the 臺灣總部: following plants. 臺灣省臺中市龍井區台西南路 256 巷 28 弄 5 號 Manufacturer : TEL:+886-4-26302881 ishan Precision Industry Co., Ltd. FAX:+886-4-26302880 Add: No. 5, Alley 28, Lane 256, Tai Si S. Rd, Lung Ching Hsiang, TaichungHsien, Taiwan E-mail:ishan@tcts.seed.net.tw TEL: +886-4-26302881 FAX: +886-4-26302880 Http://www.ishan.com.tw...
Need help?
Do you have a question about the YGL-G and is the answer not in the manual?
Questions and answers