ActronAir ERQ2-16AS Installation And Commisioning Manual
ActronAir ERQ2-16AS Installation And Commisioning Manual

ActronAir ERQ2-16AS Installation And Commisioning Manual

Esp platinum que split ducted unit - 3 phase

Advertisement

Quick Links

ESP Platinum QUE
Split Ducted Unit - 3 Phase
Installation and Commisioning Guide - Indoor
Model Numbers
ERQ2-16AS
ERQ3-18AS
ERQ5-21AS
ERQ5-24AS
IMPORTANT NOTE:
Please read this manual carefully before installing or operating your air conditioning unit.

Advertisement

Table of Contents
loading

Summary of Contents for ActronAir ERQ2-16AS

  • Page 1 ESP Platinum QUE Split Ducted Unit - 3 Phase Installation and Commisioning Guide - Indoor Model Numbers ERQ2-16AS ERQ3-18AS ERQ5-21AS ERQ5-24AS IMPORTANT NOTE: Please read this manual carefully before installing or operating your air conditioning unit.
  • Page 2: Table Of Contents

    ESP Platinum QUE - Three Phase Installation and Commissioning Guide Table of Contents 01. Introduction ............................03 01.01. Information About This Guide 01.02. Product Inspections 01.03. Codes, Regulations and Standards 02. Safety Instructions .......................... 04 03. Components Overview ........................05 04. Indoor Unit Dimensions / Clearances ....................06 04.01.
  • Page 3: Introduction

    Check your air conditioning unit and all items against the invoice upon receiving your shipment. Inspect the unit, components and accessories for any sign of damage. If there is any damage to the unit, contact ActronAir Customer Care Department immediately on: 1300 522 722 to obtain a Goods Return Number.
  • Page 4: Safety Instructions

    Training dependent on local State/Territory regulations. IMPORTANT NOTES TO INSTALLER • This indoor unit is designed to match only with a specific ActronAir outdoor unit as specified in the Technical Selection Catalogue. • This unit is designed for use with R410A refrigerant only.
  • Page 5: Components Overview

    INDOOR CONTROL PANEL SAFETY TRAY CONNECTION * Applicable to ERQ5-21AS and ERQ5-24AS only. ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 6: Indoor Unit Dimensions / Clearances

    ESP Platinum QUE - Three Phase Installation and Commissioning Guide 04. Indoor Unit Dimensions / Clearances 04.01. Unit Dimensions and Weights ERQ2-16AS / ERQ3-18AS 1290 O/A OVERALL NOMINAL DIMENSION (H x W x D) 1100 = 412 x 1290 x 615...
  • Page 7 • Do not scale drawing. Unit Model Number Unit Weight (kg) ERQ5-21AS ERQ5-24AS ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 8: Minimum Service Access Areas And Airflow Clearances

    • Minimum service access areas and spaces for airflow clearances are the responsibility of the installer, ActronAir will not be held liable for any extra charges incurred due to lack of access and space for airflow.
  • Page 9: Installation Instructions

    Compliance and consultation with the authorities having jurisdiction with the installation of this equipment is the responsibility of the installer. ActronAir will not be held liable for any damages or costs as a result of the installer’s failure to comply. Please refer to the matching outdoor unit Installation and Commissioning Guide for further information and details.
  • Page 10: Return Air Filter

    Guide of the outdoor unit that matches your indoor unit. Please refer to this guide and thoroughly understand the procedures for safe and correct indoor and outdoor connection. ActronAir highly recommend all field pipes to be insulated. 05.08. Electrical Field Connection The power supply and control communication data to the indoor unit are supplied via the outdoor unit.
  • Page 11: Unit Lifting Procedures

    4. Test lift the unit to determine exact unit balance and stability before hoisting it to the installation location. ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 12: Fork Lift Method

    R410A ESP Platinum QUE - Three Phase Installation and Commissioning Guide ELECTION DATA SRD175C / SRD175E 06.02. Fork Lift Method P SPLIT DUCTED UNIT Fig. 2 Pallet fork lifting hole dimensions Insert forklift All dimensions in mm. tines here DIGITAL SCROLL ELECTRICAL PANEL END COMPRESSOR Insert forklift...
  • Page 13: Safety Drain Tray

    INSTALL A T-PIECE AS AN AIR VENT FOR LONG DRAIN RUNS. ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd. DESIGNS AND SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
  • Page 14: Zone Barrel Mounting Instructions

    ESP Platinum QUE - Three Phase Installation and Commissioning Guide 08. Zone Barrel Mounting Instructions Damper Motor on Top of the Zone Barrel Duct Zone Barrel Duct TOP VIEW RECOMMENDED LOCATION PREFERRED LOCATION UPPER HALF OF ZONE DAMPER MOTOR ON BARREL’S CENTRE LINE TOP OF THE ZONE BARREL...
  • Page 15: Indoor Unit Wiring Diagram

    INSTALLATION & COMMISSIONING OUTDOOR & INDOOR UNIT MANUAL FOR ALL AVAILABLE CONFIGURATIONS ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Date Rev. Description Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 16: Maximum Cable Lengths

    ESP Platinum QUE - Three Phase Installation and Commissioning Guide 10. Maximum Cable Lengths OPTIONAL DUAL MASTER CONTROLLER (Mimic Logic) Master Secondary Controller Controller MODEL INDOOR UNIT R-410A “CAUTION” PLEASE NO GAS / PRESSURE IN THE ENSURE THERE IS FAN COIL UNIT BEFORE REMOVING COPPER END CAPS.
  • Page 17: Maximum Cable Lengths - Zoning

    3 to 9 and 2 to 11 3-way cable joiner to zone device ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 18: Maintenance Frequency Checklist

    ESP Platinum QUE - Three Phase Installation and Commissioning Guide 12. Maintenance Frequency Checklist Regular servicing of equipment by a qualified technician is recommended every 12 months for residential applications and every quarter for commercial applications. Regular servicing of your unit helps in maintaining its optimum performance and reliability.
  • Page 19: Key Parts List

    4070-028 1 per controller 1 per controller 1 per controller 1 per controller ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2019 Actron Engineering Pty. Ltd.
  • Page 20 Refrigerant Trading Authorisation No.: AU06394 ©Copyright 2018 Actron Engineering Pty Limited ABN 34 002767240. ®Registered Trade Marks of Actron Engineering Pty Limited. Document: 0525-061 Ver. 1 Issue Date: 01/2019...