Pre-Installation - Ketra LS0 Installation Manual

Low-voltage linear
Hide thumbs Also See for LS0:
Table of Contents

Advertisement

Pre-Installation

WARNING:
Turn OFF electrical power to all circuit breakers feeding into the panel before installing or servicing
this product.
Improper use or installation can cause SERIOUS INJURY, DEATH, OR LOSS/DAMAGE OF PROPERTY.
Read all installation instructions and warnings before beginning installation process.
Installation instructions may change without notice due to continuous improvements.
Do not use product if it is damaged.
Fixtures contain no user-serviceable parts.
Do not connect product to any voltage or frequency supply other than an X96 controller.
If placed in enclosure alongside other electrical components, take necessary precautions regarding
operating temperatures.
Product is UL surface-mount listed. Does not require a dedicated enclosure.
Notes:
The X96 Ketra controller provides low-voltage power and communication to the LS0 luminaires. The X96
-
needs to be between the AC mains power source and the run of LS0 linear.
Mount such that the total cable length from the X96 controller to the last LS0 segment is no more than
-
50 ft (15.2 m).
A total cable length of 50 ft (15.2 m) can be used in a system run.
-
Each X96 controller can support up to 15 ft (4.6 m) to 24 ft (7.3 m), depending on the style.
-
15 ft (4.6 m) for the high output style and 24 ft (4.6 m) for the long run style. For longer run lengths, use
additional X96 controllers.
Connect all product in a single run to the X96 controller. For more details, please refer to the installation
-
instructions for the X96 controller.
'Star' or parallel wiring installations are not supported (see diagrams on the following page).
-
P/N 3662562 Rev A
© 2021 Lutron Electronics Co., Inc. All rights reserved.
5 | LS0 INSTALLATION GUIDE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cm-ls0Hw-ls0

Table of Contents