5
Installation
4. VALVE CONNECTIONS/CONNECTORS:
If the valve is fitted with connectors, you may proceed with installation.
Correctly insert the gaskets and tighten the connectors. For hygienic
applications, easy cleanable process connections according to the
EHEDG Position paper are recommended (see www.ehedg.org/
guidelines/).
5. WELDING THE VALVE BODY ONTO PIPING:
1. Insert air couplings in the central connector
2. Remove the body from the rest of the valve before proceeding with
welding operations.
CAUTION!
Hand crushing hazard. During operation there is a crushing hazard
caused by the washing pin or the guide pin (when present).
6. VALVE RIGHT INSTALLATION:
To guarantee its drainability, make sure the valve is in a vertical
position
14
EN-IST-B925-0621