Samoa U-VISION 383 400 Parts And Technical Service Manual page 3

Control meter
Hide thumbs Also See for U-VISION 383 400:
Table of Contents

Advertisement

Available languages

Available languages

BATTERIES INSTALLATION AND REPLACEMENT
2
1
3
2
CONFIGURATION
PAIRING THE U·VISION WITH A FLUID MANAGEMENT UNIT
This unit can be paired with a U·meter+, U·valve or U·count unit.
Pressing the power button shows the start screen (fig. 1) during a short time. In the bottom left screen it is shown the
actual U·Vision firmware.
Then the unit will try connection showing the connecting screen (fig. 2). This screen will disappear after a brief moment
if the unit has already been configured, but if it has not been paired then the message will stay on screen waiting for
configuration.
SAMOA Industrial, S.A. · Pol. Ind. Porceyo, I-14 · Camino del Fontán, 831 · 33392 - Gijón - Spain · Tel.: +34 985 381 488 · www.samoaindustrial.com
Fig. 5
Fig. 6
Fig. 1
NOTE: The U·Vision unit is supplied without the batteries
installed, follow the next steps for proper installation.
1. Loosen the screws (1) with a T15 torx tool and remove
the battery cover (2).
2. Install the supplied batteries (3) checking the polarity as
indicated in the cover (4).
3. Put back the cover (2) and tighten the screws (1).
CAUTION: To ensure battery compartment
!
watertightness, make sure that the battery cover is
properly placed and the screws tightened.
4
Fig. 2
R. 07/17 838 842
EN
Fig. 7
3

Advertisement

Table of Contents
loading

Table of Contents