Fitting The Halyard Swivel; Assembling Foil Sections; Fitting The Telescopic Section - Facnor FD110 Installation Manual

Flatdecj furling systems
Table of Contents

Advertisement

English

4.3- FITTING THE HALYARD SWIVEL

top

4.4- ASSEMBLING FOIL SECTIONS

top
H

4.5- FITTING THE TELESCOPIC SECTION

top
I
Facnor –FlatDeck furling & reefing systems – Installation manual
Ensure you fit the halyard swivel the right way up. Fix the
Long U shackle
two shackles. In order to raise the sections as high as
possible, we recommend that you fit the halyard swivel
and raise everything by way of a halyard.
IMPORTANT : Be sure to attach a down haul line
bow shackle
to the halyard swivel so as to be able to recover it
later.
The top section is in place. Assemble a bushing around the
forestay. Slip the next section, already assembled (see
preparing the sections p.4), with the connector pointing
towards the top of the forestay. With the help of the
connector, push the bushing all the way up into the top
section until the connector holes coincide with those of the
top section.
G
Fit both screws (fig. G). then, slowly and firmly tighten the
4 screws (fig. G+H).
Repeat the operation until you reach the last section. DO
NOT FIX ANYTHING TO THE LAST SECTION.
Once the sections have been hoisted as high as possible,
assemble a bushing around the forestay.
Fit the telescopic section and push it up. That way, the
bushing (fig. J) goes into the lowest foil section (Rep. I).
J
K
If your forestay requires the use of a 1-meter
section, fit it above the lowest 2-meter section.
BEWARE :
SECTION TO THE FORESTAY AS INDICATED
(fig. K). THE SIDE WITH ONLY ONE HOLE
MUST BE POINTING DOWN.
FIT
THE
TELESCOPIC
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fd190Fd230Fd310

Table of Contents