Pipe Work; Flow Direction - Elecro Engineering CLASSIC H.R. UV-C SPA Installation & Operating Manual

Table of Contents

Advertisement

3.2 Pipe work

The H.R.UV-C SPA should be placed downstream (after) of any pumps, filters and heating devices but
upstream (before) of any chemical dosing or similar water treatment (see Figs.4 ).

3.3 Flow direction

The
H.R.UV-C SPA
is factory set to accept input water flow entering on the left and exiting on the right,
Fig. 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CLASSIC H.R. UV-C SPA and is the answer not in the manual?

This manual is also suitable for:

Hr-30-spa

Table of Contents