Elecro Engineering Escalade Installation & Operating Manual

Welded heat exchanger

Advertisement

Quick Links

Escalade Welded Heat Exchanger
Installation & Operating Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Escalade and is the answer not in the manual?

Questions and answers

Summary of Contents for Elecro Engineering Escalade

  • Page 1 Escalade Welded Heat Exchanger Installation & Operating Manual...
  • Page 2 CONTENTS 1. PRODUCT OVERVIEW ......................3 2. GENERAL INSTALLATION INSTRUCTION ................ 4 2.1 Mounting instruction ......................4 2.2 Flow Direction ........................6 3. WATER QUALITY......................... 7 4. WARRANTY ......................... 7...
  • Page 3 INTRODUCTION Thank you for purchasing a Escalade swimming pool heat exchanger manufactured to the highest standards in England. To ensure years of trouble-free service, please read and follow these instructions for proper installation, maintenance and use. WARNING: Failure to install the unit correctly may result in the warranty being void.
  • Page 4 Dimensions (mm): 30 – kW 40 – kW 75 – kW 2. GENERAL INSTALLATION INSTRUCTION 2.1 Mounting instruction The Elecro Heat Exchanger can be installed either horizontally or vertically. (Please see Figs. 3 and 4). Vertical Installation...
  • Page 5 Horizontal Installation Wall Mounting...
  • Page 6 2.2 Flow Direction The Elecro Heat Exchanger should be connected to the two independent water circuits as follows: 1. Connection to Water Filtration Circuit (Secondary) The Heat Exchanger should be plumbed in-line, after the filtration pump and filter and before any water treatment equipment.
  • Page 7 The primary and secondary circuits should be installed so water flows are counter current i.e. the water from the primary circuit should flow in the opposite direction to the water in the secondary circuit. CAUTION If the Heat Exchanger is not used during the winter months, it must be drained to prevent frost damage. NOTE: For Winterising / maintenance, it is recommended that the Heat Exchanger is installed with isolation valves on both water input and output sides of the primary and secondary circuits.
  • Page 8 Unit 11, Gunnels Wood Park, Stevenage, Herts SG1 2BH Sales@elecro.co.uk www.elecro.co.uk +44 (0) 1438 749474 © Copyright MANE1-EN-Escalade Manual V1-01.01.2020-Elecro...