Wiring Diagrams; Dismantling; Environmentally Responsible Disposal - Maico ER EC RF17 Installation And Operating Instructions Manual

Er ec flush-mounted exhaust air systems according to din 18017-3
Table of Contents

Advertisement

11 Wiring diagrams

11 Wiring diagrams
Nominal load can be
switched without base load
*If the units are connected with 2 cable cores
(nominal load switchable with 2 cable cores, base
load switchable with 2 cable cores), the ER-A
cover is to be used. The ER-AK, ER-AH and ER-
AB covers require a permanent electrical connec-
tion.

12 Dismantling

Dismantling is only permissible by persons with
electrical training.
8
Cut off and insulate PE conductor and individual cable cores that are not required
Nominal load can be
Nominal load and base load
switched with permanent
can be switched
base load
Please tick the connection variant
5. Run function test: Test all unit functions (over-
run time, interval, humidity control etc.)
For ER-A, no setting functions. For ER-AK,
ER-AH, ER-AB, the operating parameters
can be changed.
6. Fold down the upper part of the cover (upper
part must audibly engage).
Nominal load switchable with
2 cable cores*
13 Environmentally responsible
disposal
Once they are no longer needed, packaging ma-
terials and used units should be disposed of in
compliance with local regulations. Do not dispose
of old units in the normal household waste.
Base load switchable with 2
cable cores*

Advertisement

Table of Contents
loading

Table of Contents