Installation; Unpacking And Inspection; Preparation; Mounting The Unit - INFOSEC C3 MPPT User Manual

Table of Contents

Advertisement

Available languages

Available languages

2. INSTALLATION

2-1. Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You
should have received the following items inside of package:
 C3 MPPT / C3+MPPT x 1
 User manual x 1
 USB cable x 1
 RS232 Cable x1
 Software CD x 1

2-2. Preparation

Before connecting all wirings, remove the bottom cover by releasing the two screws as shown below.

2-3. Mounting the Unit

Consider the following points before selecting where to install the
unit:
Do not mount C3 MPPT / C3+MPPT on flammable
construction materials.
Mount on a solid surface.
Install C3 MPPT / C3+MPPT at an eye level in order to be
able to read the LCD screen at all times.
The ambient temperature should be between 0°C and 55°C
to ensure an optimal operation.
The recommended installation position is against a wall,
vertically.
Make sure to keep other objects and surfaces as shown in
the right diagram to guarantee sufficient heat dissipation
and to have enough space for removing wires.
SUITABLE FOR MOUNTING ON CONCRETE OR
OTHER NON-COMBUSTIBLE SURFACE ONLY.
Install the unit by screwing three screws. It is recommended to
use M4 or M5 screws.
INFOSEC UPS SYSTEM - 4, rue de la Rigotière - 44700 Orvault - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - hotline@infosec.fr – 06 15 AA 59 203 33
Diagram 5: Removing the rear panel of C3 MPPT/C3+ MPPT
Diagram 6: Installation of C3 MPPT / C3+MPPT
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents