INFOSEC C3 MPPT User Manual page 10

Table of Contents

Advertisement

Available languages

Available languages

3KVA
4KVA
5KVA
Please follow the steps below to implement AC input/output connection:
1. Before proceeding to the AC input/output connection, make sure you open the DC protector or
disconnector first.
2. Remove the insulation sleeve 10mm for six conductors and shorten phase L and neutral conductor
N 3 mm.
3. Insert the AC input wires according to the polarities indicated on terminal block and tighten the
terminal screws. Make sure to connect the PE protective conductor (
→Ground (yellow-green)
L→LINE (brown or black)
N→Neutral (blue)
WARNING:
Make sure that AC power source is disconnected before attempting to hardwire it to the
unit.
4. Then, insert the AC output wires according to the polarities indicated on the terminal block and
tighten the terminal screws. Make sure to connect PE protective conductor (
→Ground (yellow-green)
L→LINE (brown or black)
N→Neutral (blue)
INFOSEC UPS SYSTEM - 4, rue de la Rigotière - 44700 Orvault - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - hotline@infosec.fr – 06 15 AA 59 203 33
12 AWG
10 AWG
8 AWG
Diagram 9: Connecting the AC input to C3 MPPT / C3+MPPT
Diagram 10: connecting the AC output from C3 MPPT / C3+MPPT
4 mm²
6 mm²
10 mm²
) first.
1.2~ 1.6 Nm
1.4~ 1.6Nm
1.4~ 1.6Nm
) first.
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents