Chapter 2
| Installation Overview
AP Installation Tasks
Task 5
Figure 8: Connecting AC Power
1
1
Connect the AC power cord to a nearby AC power source.
2
Connect Ethernet cable from the "DATA IN" port to a LAN switch.
3
Connect straight-through Ethernet cable from the AP to the "DATA & POWER OUT" port.
Verify AP Operation
Verify basic AP operation by checking the system LEDs.
When operating normally the Pwr/Sys LED should be on green, the Ethernet LED
on/blinking orange, and the wireless interface LEDs on/blinking orange.
Go to the section
Figure 9: System LEDs
1
System Status LEDs.
3
"Understanding the System Status LEDs"
1
– 20 –
2