PERCo ST-11 Assembly And Operation Manual

PERCo ST-11 Assembly And Operation Manual

Speed gate and double-sided section
Hide thumbs Also See for ST-11:

Advertisement

Quick Links

Speed gate
ST-11
and double-sided section
STD-11
ASSEMBLY AND OPERATION MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ST-11 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for PERCo ST-11

  • Page 1 Speed gate ST-11 and double-sided section STD-11 ASSEMBLY AND OPERATION MANUAL...
  • Page 2 Speed gate ST-11 and double-sided section STD-11 Assembly and operation manual...
  • Page 3: Table Of Contents

    TECHNICAL SPECIFICATIONS .................... 6 DELIVERY SET ........................7 Standard delivery set ....................... 7 4.1.1 ST-11 Speed gate ........................7 4.1.2 STD-11 double-sided section ....................8 Optional equipment that can be ordered in addition to the standard delivery set ..... 9 DESIGN AND OPERATION ....................
  • Page 4: Function

    Due to continuous improvement of products, the Manufacturer reserves the right to modify, without previous notice, the product design not aggravating its technical specifications. 1 FUNCTION ST-11 speed gate (hereinafter – the speed gate) is designed for pedestrian passage control at entrance points of administrative buildings, banks, shops, railway terminals, airports, etc. Attention! ST-11 speed gate is designed for the passage of pedestrians taller than 1 m, otherwise correct operation of the speed gate is not guaranteed.
  • Page 5 Assembly and Operation Manual Figure. 1 ATG-300 overall dimensions Figure. 2 ATG-300H overall dimensions...
  • Page 6 ST-11 Speed gate, STD-11 Double-sided section Figure. 3 ATG-425 overall dimensions Figure. 4 ATG-475 overall dimensions...
  • Page 7: Technical Specifications

    The power supply is connected to the control board located in the Master section (on the Master side of the double-sided section) and has the “ST-11.771” marking. Current consumption and power consumption are given for each product ST-11 and STD-11 individually. Maximum allowable cable length of the RC panel is 40 m (supplied upon request).
  • Page 8: Delivery Set

    ST-11 Speed gate, STD-11 Double-sided section Mean time to failure ................. min. 5,000,000 passages Mean lifetime ........................8 years Overall dimensions (L × W × H): see Fig. 1 - 5), mm: with ATG-300 swing panel ................. 1236×944×1022 mm with ATG-300H swing panel ............... 1236×944×1300 mm with ATG-425 swing panel ...............
  • Page 9: Std-11 Double-Sided Section

    Assembly and Operation Manual Central post indication block mounting kit: M5×16 screw ........................4 washer (5) ..........................4 Swing panel cover plate mounting kit: M4×10 screw ........................8 washer (4) ..........................8 Swing panel mounting kit: M10×30 bolt ......................... 6 screw nut M10 ........................
  • Page 10: Optional Equipment That Can Be Ordered In Addition To The Standard Delivery Set

    IR03.1 (HID / EMM), or MR07 OEM (Mifare), or RP-15.2 (HID / EMM, Wiegand) type card readers ..................2 per a passage lane Anchor PFG IH10 ("SORMAT" company, Finland) with screw and washer: for the ST-11 speed gate ......................12 for STD-11 section ........................8 Wireless remote control ......................
  • Page 11: Design

    Manual in accordance with Fig.6 and 7. Figure. 6 ST-11 overall view: 1 – central post; 2 – central post cover plate; 3 – swing panel cover plate; 4 – swing panel;...
  • Page 12 ST-11 Speed gate, STD-11 Double-sided section Figure. 7 STD-11 overall view: 1 – central post; 2 – central post cover plate; 3 – swing panel cover plate; 4 – swing panel; 5 – central post indication block; 6 – front end indication block; 7 – the section top duct;...
  • Page 13: Indication Blocks

    Assembly and Operation Manual 5.2.1 Section Each section consists of three posts: one central (1) and two side (9) posts. The posts are connected by the section top duct (7) with the two intrusion detectors top ducts (11) and two intrusion detectors bottom duct.
  • Page 14: Control Board

    ST-11 Speed gate, STD-11 Double-sided section passage in the chosen direction. Up above the buttons there are LED lights, indicating passage direction status. The red “Stop” indicator shows the “Always locked” operating mode. The possible operation commands and RC-panel indication for pulse and potential operating modes are stated in Tables 7 and 8.
  • Page 15 Assembly and Operation Manual • XP6 (BUZZ) – connector for turning on the buzzer on the control board. Buzzer operation duplicates operation unit sound indication and siren activation. The jumper is installed by default, which corresponds to the activated buzzer. •...
  • Page 16: Control Signals

    ST-11 Speed gate, STD-11 Double-sided section Table 2. Positioning of Size1according to the swing panel type Switches positioning Swing panel model Size1 Size2 ATG-300 ATG-300H ATG-425, ATG-475 Table3. Speed gate operating modes in different positions of R1 and R2 switches...
  • Page 17: Control Modes

    Assembly and Operation Manual Control element is to provide the following characteristics of the signals: control element – relay contact: minimum commutated current ................max 4 mA closed contact resistance (regarding connection cable resistance) ....max 200Ohm control element – open collector output layout: closed contact voltage (low level signal, on the control board input) ....
  • Page 18: Speed Gate Operation Algorithm

    ST-11 Speed gate, STD-11 Double-sided section 5.2.7 Speed gate operation algorithm Speed gate operation algorithm in pulse control mode in case of single passage in one of the directions: 1. A command (control signals combination) for single passage performance in one of the directions is sent from the control device (RC-panel, WRC, ACS-controller) to the control board inputs.
  • Page 19: Fire Alarm Device

    Assembly and Operation Manual RC-panel wires, which are connected to Unlock A and Unlock B contacts, as well as Led A and Led B respectively (Table 4). Figure. 12 Standard RC-panel orientation regarding sections Note: • When the turnstile functions as a part of the ACS it is recommended to connect the RC to the ACS controller according to the operational documentation.
  • Page 20: Operation From The Acs

    ST-11 Speed gate, STD-11 Double-sided section If the control signal is sent to Fire Alarm input at the moment of passage performance, the speed gate turns to “Fire Alarm” mode. The swing panels remain open until the signal release. After control signal release the “Always locked”...
  • Page 21: External Indication

    The number of boxes depends on the ordered delivery set. The transportation boxes overall sizes: ST-11: box with the sections ST-11/M and ST-11/S .......... 157×56×108 cm STD-11: box with the two-sided section ............. 157×34×108 cm STC-11, SDC-11 (set of section top covers) ............139×15×18 cm ATG-300 (panels set) ....................
  • Page 22: Safety Requirements

    ATG-475 (panels set) ....................66×61×8 cm Transportation boxes weight (gross): ST-11: box with the sections ST-11/M and ST-11/S ..........max 160 kg STD-11: box with the two-sided section ..............max 105 kg Box with STC-11 (set of section top covers) ............... max 19 kg Box with SDC-11 (double-sided section cover) ............
  • Page 23: Installation Details

    Assembly and Operation Manual 8.1 Installation details It is recommended: • to mount the speed gate on a steady and level concrete (grade 400 or higher, strength class B22.5), stone or similar foundation at least 150 mm thick. • to level the foundation so that the anchoring points of the speed gate are flush with the surface (check it with a level).
  • Page 24 0.5º. It is allowed to use mounting gaskets. For the hole spacing use the cardboard template (from the ST-11 set). Use the same template for the hole spacing of the two-sided sections STD-11.
  • Page 25 (installer) in accordance with the checkpoint design and the characteristics of the access control system and the control controller. It is possible to install readers as manufactured by PERCo (IR03.1, MR07 OEM, RP-15.2), and third-party manufacturers. Readers must meet the following requirements: overall dimensions (length ×...
  • Page 26: Mounting Surface Marking Layouts

    ST-11 Speed gate, STD-11 Double-sided section 25. Mount central post indication blocks (5) (see Fig. 22, Sect.8.9.5) (included in the installation kit). 26. Install section top covers (6) (see Fig. , Sect.8.9.6). 27. Use switches on the Master section control board (side of the section) (see Sect. 5.2.4) in order to: •...
  • Page 27: Speed Gate Wiring Diagram

    Assembly and Operation Manual Figure. 16 Speed gate and double-sided section marking layout 8.6 Speed gate wiring diagram Figure. 17 Diagram of connections for the ST-11 turnstiles and the two-sided sections STD-11 to organize the check-point with several passage zones...
  • Page 28 ST-11 Speed gate, STD-11 Double-sided section Figure. 18 Speed gate wiring diagram The list of elements of the diagram are indicated in table6. The equipment marked (*) is not included in the standard delivery set. WRC is connected to Unlock A, Stop, Unlock B and GND contacts of the X3 terminal block.
  • Page 29: Training Mode

    Assembly and Operation Manual Table 6. List of the elements of speed gate wiring diagram Legend Name Nr, pc. Master section (section side) A1.1 Control board A1.2 Drive control board, Master section (section side) Slave section (section side) A2.1 Drive control board, Slave section (section side) RC-panel Speed gate power supply Fire Alarm signal sending device...
  • Page 30 ST-11 Speed gate, STD-11 Double-sided section Attention! Change the position of the switches only when the speed gate is turned off. This operating mode allows to organize the free passage in one preselected direction, when the swing panels automatically open and close after the passage. In the direction selected for the "Auto-opening"...
  • Page 31: Assembly And Disassembly Of The Speed Gate Components

    Assembly and Operation Manual 8.9 Assembly and disassembly of the speed gate components Attention! Speed gate components are made of polished stainless steel and glass. Be careful during the assembly, to prevent the components from falling and damage, place them on an even and steady surface, prevent them from scratches.
  • Page 32: Front Panel Of The Side Post

    ST-11 Speed gate, STD-11 Double-sided section 8.9.2 Front panel of the side post Remove the side post front panel (10), moving it up along the post and then pull it, bringing the hooks from slots in the side post (Fig. 20). Be careful not to damage the connection cable! Disconnect the connection cable output from the front-end indication block.
  • Page 33: Swing Panel

    Assembly and Operation Manual 8.9.3 Swing panel Two people shall install and remove the swing panels. The swing panel is fixed to the rotating support in three places with M10×30 bolts, 10 washers, plastic bushing and M10 screws (Fig. 21). Use S17 open end wrenches.
  • Page 34: Central Post Indication Block

    ST-11 Speed gate, STD-11 Double-sided section 8.9.5 Central post indication block In order to install the central post indication block (5), proceed as follows (Fig. 22): 1. Pull the cable from central post indication block into the post top duct through the hole above the central post.
  • Page 35: Intrusion Detectors Duct Covers

    Assembly and Operation Manual Figure. 23 Top cover installation • Connect the connection cable from the indication control module (“PASS” connector, Fig. 20) to the indication plate • Carefully put the cover on the top duct of the section. To prevent the cables from the damage, ensure that they do not get stuck between the fixing brackets and protection plates! •...
  • Page 36: Operation

    ST-11 Speed gate, STD-11 Double-sided section Figure. 24 Dismantling the intrusion detectors top and bottom ducts 9 OPERATION Follow the instructions of speed gate operation in accordance with Sect. 7.2. Attention! Do not move through the speed gate passage area any objects with dimensions •...
  • Page 37: Power-Up

    Assembly and Operation Manual 9.1 Power-up Attention! Before speed gate power-up make sure that the passage lane is free and nothing interferes with the swing panels movement. In order to power up the speed gate, proceed as follows: 1. Connect the speed gate power supply unit to the AC outlet with the voltage and frequency rating complying with the certificate for the power supply unit.
  • Page 38: Potential Control Mode

    ST-11 Speed gate, STD-11 Double-sided section • After sending “Free passage in a set direction” command, only “Always locked” or “Single passage in a set direction” command for the opposite direction can be sent, all other commands will be ignored.
  • Page 39: Potential Failures

    5.2.7 If the failure couldn't be fixed, contact the closest PERCo Customer Services. The list of the Customer Services can be found in the certificate of the product. 10 MAINTENANCE Technical maintenance is to be performed by qualified specialists after careful study of this Manual.
  • Page 40: Appendix 1. Operation Algorithm At Pulse Control Mode

    ST-11 Speed gate, STD-11 Double-sided section ANNEXES Appendix 1. Operation algorithm at pulse control mode “Always locked” (locked for entry and exit) – active front at the Stop contact while there is a high level at the Unlock A and Unlock B contacts. Both passage directions are locked at this command.
  • Page 41 PERCo Polytechnicheskaya str., 4, block 2 194021, Saint Petersburg Russia Tel: +7 812 247 04 64 E-mail: export@perco.com support@perco.com www.perco.com...
  • Page 42 www.perco.com...

This manual is also suitable for:

Std-11

Table of Contents