4. Connect the supply hose (GG) between the remote
fill station pump (AA) and the fill coupler (FC) port
marked with an "I" (F
5. Start the remote fill station pump (AA).
6. When the tank (K) is filled:
•
The remote fill station pump (AA) stalls
(dead-heads),
•
The Auto-Fill Shut Off pin (V2) pops up
(F
. 20),
IG
•
The pressure gauge needle rises to the set
pressure (F
. 19).
IG
NOTE: If the pump does not stall (dead-head), there is
a leak in the system.
V2
F
. 20
IG
3A6932D
. 16).
IG
7. Turn off the remote fill station pump (AA) (F
NO
8. Pull and hold the fill valve pressure relief knob (FF)
long enough to relieve line pressure between the fill
valve (EE) and the Auto-Fill Shut Off valve (V) and
between the remote fill station pump (AA) and the
fill valve (EE) (F
. 19).
IG
NOTE: The length of time to vent the pressure varies
upon system design and installation. In some installa-
tions, Step 8 may need to be repeated until pressure is
relieved.
9. Disconnect the supply hose (GG) from the fill cou-
pler (FC) (F
. 19).
IG
10. Replace the dust cover (DC) over fill coupler (FC)
(F
. 19).
IG
Operation
. 16).
IG
13