Connect And Route Cords And Cables; Installing The Front Bezel On 1U System; Installing The Front Bezel On 2U System - Dell EMC VxFlex Ready Node 14G Hardware Installation Manual

Hide thumbs Also See for EMC VxFlex Ready Node 14G:
Table of Contents

Advertisement

2U1N Configuration Equipment Installation

Connect and route cords and cables

Hardware Installation Guide
72
Figure 32 Installing the front bezel on 1U system
Figure 33 Installing the front bezel on 2U system'
Procedure
1. Connect the power cords and I/O cables as described in documentation for
your system.
2. If the system uses a cable management arm (CMA), install it as described in the
document shipped with the CMA.

Advertisement

Table of Contents
loading

Table of Contents