S300 Refractory Walled Air Curtain Burner with HATZ 4H50TIC Diesel Engine
OPERATING MANUAL
LIFTING POINTS
There are four designated lifting pad eyes for lifting all FireBox units by crane, two
on each side. Only lift by attaching straps or cables to these four pad eyes.
Their locations are marked with yellow lifting point labels with up-arrows. S300 ash
rakes are shipped in a cradle as shown here to facilitate the transport of the over-
sized load in the US. The cradle must be removed before the FireBox is used.
The Stair Guard is
shipped in place secured
with a bolt and nut (red
circle in photo to right).
The bolt should be re-
placed with a suitable
padlock, before the Fire-
Box is placed into service.
FireBox Lifting Points
Page 29 of 29
(Vers.02.02.2021)