Air Burners 300 Series Operating Manual page 19

Self-contained refractory walled air curtain burner
Table of Contents

Advertisement

S300 Refractory Walled Air Curtain Burner with HATZ 4H50TIC Diesel Engine
OPERATING MANUAL
SITE PREPARATION
The "Two Pile System"
For an efficient operation you would have two piles:
The first pile or "main debris" pile, is the material being generated from the land clear-
ing or forest clearing operation and is located away from the ember path but with good
access to your loading machinery.
The second pile or "good wood" pile is your best and most burnable wood. When you
first setup, the site the operator should spend some time sorting through the main de-
bris pile pulling out what appears to be your best and most burnable materials. This is
the material with which you will start the fire, this is the material that will give you a
good, hot burning base fire. You will also draw from the "good wood" pile throughout
the day if you should need to stoke up the fire (more on this in the following sections).
As the FireBox operator is drawing from the main debris pile throughout the day, he
should continue to replenish the "good wood" pile as necessary. The "good wood" pile
only needs to be enough material to stoke-up the fire if needed and enough material to
get you started the next day.
IMPORTANT WARNING ABOUT BURNING OF PALLETS
Wooden Pallets, especially spent pallets burn extremely hot. DO NOT load
the FireBox above approximately 3/4 of the height of the burn chamber. Heat
damage to the manifold and other structure may occur which would not be
covered under your Limited Factory Warranty.
DANGER:
You must insure debris does not build up on the equipment
front deck. It must be kept clean at all times during operation to prevent a
fire that would damage or destroy the engine and accessories.
Page 15 of 29
(Vers.02.02.2021)

Advertisement

Table of Contents
loading

This manual is also suitable for:

S327S330

Table of Contents