Matsuko Switch Box Installation And Operating Manual

Matsuko Switch Box Installation And Operating Manual

Advertisement

Quick Links

INSTALLATION AND
OPERATING MANUAL
Switch Box, Switch Box Timer, Switch Box Timer + Pump Guard
WARNING:
Ensure that your Matsuko Switch Box is switched off at the mains before you
attempt to conduct any type of maintenance.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Switch Box and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsuko Switch Box

  • Page 1 INSTALLATION AND OPERATING MANUAL Switch Box, Switch Box Timer, Switch Box Timer + Pump Guard WARNING: Ensure that your Matsuko Switch Box is switched off at the mains before you attempt to conduct any type of maintenance.
  • Page 2: In The Event Of A Power Failure

    • Young children should always be supervised near water. IN THE EVENT OF A POWER FAILURE Following a power failure, the Switch Box will restart with each line in the same position as before the power interruption. The Switch Box Timer will resume as per its programming.
  • Page 3 INTRODUCING THE MATSUKO SWITCH BOX RANGE Switch Box Timer* Congratulations on purchasing your Matsuko Switch Box. All Matsuko Switch Boxes are built to 5 Way Programmable Switch Box - Offers 5 lines complement your outdoor enjoyment, giving you total control of your lifestyle. All Matsuko Switch of power each delivering up to 1500 W per line.
  • Page 4: Installation

    ** A double layer capacitor stores electrical energy to remember your programs in case of a power cut for at least 24 hrs when fully charged. The Matsuko double layer capacitors need minimum 48 hours to be fully charged. Page 6...
  • Page 5: Connecting The Cables

    Do not attempt to install cables without required knowledge and There are two blanking plugs supplied with Matsuko Switch Boxes. These blanking plugs should expertise! Use of a qualified electrician is recommended for all installations.
  • Page 6: Programming Mode

    The screen will display a large TICK to confirm that program slot changes have been recorded. When a line switches on, the light on the Switch Box will illuminate to show the line is on. POWER PUMP...
  • Page 7: Device Descriptions

    Select the line you want to change using Up when your pump blocks or overloads. and Down . Press Enter . Line 1 on every Matsuko Switch Box Timer + PG is set to automatically learn how the new pump If required, use Up and Down to change the name of the device and press Enter .
  • Page 8 NOTES ................NEW FEEDER TIMER FUNCTION (SWITCH BOX TIMER AND TIMER + PG) ................The new feeder timer function lets you specify the amount of time you want a feeder to ................operate. This can be set in minutes and seconds.
  • Page 9 Tel: 01226 397383 Email: sales@matsuko.co.uk Web: www.matsuko.co.uk...

This manual is also suitable for:

Switch box timerSwitch box timer + pg

Table of Contents