Panasonic WH-MHF12G9E8 Service Manual page 40

(mono bloc) air-to-water heat pump system
Hide thumbs Also See for WH-MHF12G9E8:
Table of Contents

Advertisement

Apply cut
Connecting with external device (optional)
1. All connections shall follow to the local national wiring standard.
2. It is strongly recommended to use manufacturer-recommended parts and accessories for installation.
3. Maximum output power of booster heater shall be ≤ 3 kW. Booster Heater cord must be (3 × min 1.5 mm
type designation 60245 IEC 57 or heavier.
4. Three-way Valve shall be spring and electronic type, refer to "Field Supply Accessories" table for details. Valve
cable shall be (3 × min 0.5 mm
sheathed cable.
* note: - Shall be CE marking compliance component.
- It shall be directed to heating mode when it is OFF.
- Maximum load for the valve is 9.8VA.
5. Room Thermostat cable must be (4 or 3 × min 0.5 mm
polychloroprene sheathed cable.
6. Tank OLP cable must be (2 × min 0.5 mm
sheathed cable.
* note: - if such connection deemed NO necessary for tank OLP, please connect jumper between terminal
no. 13 and 14.
7. Tank Sensor shall be resistance type, please refer to Graph 4.1 for the characteristic and details of sensor. Its
cable shall be (2 × min 0.3 mm
polychloroprene sheathed cable.
Bushing 7
How to guide cable/cord to bushing
2
), of type designation 60245 IEC 57 or heavier, or similarly double insulation
2
), double insulation layer of PVC-sheathed or polychloroprene
2
), double insulation layer (with insulation strength of min 30V) of PVC-sheathed or
40
Bind all power
supply cords to the
U-Shaped Tube
(Covered with
foam) with band
strap (field supply)
Bind all
optional cables
and cords with
this bands.
Bind all power
supply cords to the
Tube (Covered with
foam) with band
strap (field supply)
Guide all the
cable/cord
through the
bushing
2
), double insulation layer of PVC-sheathed or
2
), of

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wh-mhf09g3e8

Table of Contents