Haier HH-DTS1 Service Manual page 5

Table of Contents

Advertisement

Because the installation is difficult and hood is heavy, the installation shall
be executed by professional person based on manul.
Strict
Execution
Don't break electric wire or other invisible equipment when cutting
Strict
something or drilling holes on ceiling.
Execution
When range hood is using in well sealed building, it should have air inlet
Strict
or open door to ensure good ventilation.
Execution
When the oil exceeds 2/3 or near tick mark in the oil cup, clean it in
Strict
time. Don't eat waste oil from oil cup.
Execution
The wall of installing range hood needs enough strength. For hollow walls,
the thickness of solid layer of hollow wall must be more than 30mm, but for
Strict
concrete walls, it can be drill holes directly. The range hood must be fixed on
Execution
the wall firmly.
Accessible parts may become hot when used with cooking appliances
Strict
Execution
DISPOSAL: Do not dispose this product as unsorted municipal waste.
Collection of such waste separately for special treatment is necessary.
This product must not be disposed together with the domestic waste. This
product has to be disposed at an authorized place for recycling of electrical
and electronic appliances.
By collecting and recycling waste, you help save natural resources, and make
sure the product is disposed in an environmental friendly and healthy way.
Notice
3
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hh-dtb1

Table of Contents