Eaton FT1455-L3 Operating Instructions Manual page 4

Hand launcher
Table of Contents

Advertisement

Install the required nozzle and adapter ring for application. The
adapter ring if needed, snaps into the face plate first.
(See Figure 3 & 4).
Figure 4
Step 3: Projectile Installation
Insert projectile into the nozzle, reattach locking ring to the firing
head by rotating ring counterclockwise. (See Figure 5 & 6).
Figure 5
EATON FT1455-L3 Hand Launcher Operating Instructions E-HOAI-CC003-E May 2015
4
Figure 6
Figure 7
Note: Failure to secure locking ring may cause serious injury to the operator
and or damage to the launcher. (See Figure 7).

Advertisement

Table of Contents
loading

Table of Contents