Download Print this page

Before You Begin - EMC Celerra NS20 Installation Manual

Dual blade
Hide thumbs Also See for Celerra NS20:

Advertisement

Welcome
The system you are about to install comes factory pre-loaded with Celerra
(DART) and CLARiiON
Software upgrade
If you bought a software maintenance contract, you are entitled to a software upgrade that is
performed only after the installation, Celerra Startup Assistant (CSA), and registration have
successfully completed.
Site preparation
Complete the site preparation by verifying the following activities before instal lation:
Network connections
Power requirements
Rack space requirements
Default IP addresses
The system components communicate with each other using a private Internet Protocol (IP) network.
By default, this network uses the IP addresses listed in the following table.
If your existing IP network uses addresses on these subnets, you are required to change the private
network addresses of your Celerra Network Server to different subnets before the installation.
Internal system addresses
Primary internal network
Backup internal network
Netmask
IP address of storage processor A
IP address of storage processor B
Gateway IP address of storage processor A
Gateway IP address of storage processor B
For more information, refer to Celerra Tools on http://Powerlink.EMC.com

Before you begin

®
storage array software (FLARE
!
®
®
).
Factory values
128.221.252.100
128.221.253.100
255.255.255.0
128.221.252.200
128.221.253.201
128.221.252.104
128.221.253.104
3
Network Server software

Advertisement

loading