CPI Satcom Division VZU-6997 Series Installation, Operation And Maintenance Manual page 66

Table of Contents

Advertisement

CHPA SERIES
For the purposes of the following test, the Remote unit should be used within sight of the
CHPA to assure that the Remote unit's appearance is consistent with the CHPA's front panel
report.
1. Verify that the Remote is attached to J6, a female 9-pin D-shell connector.
2. If the CHPA Remote panel is used, verify that the Remote Configuration is set for RMTPNL.
3. Verify that the CHPA is powered on and in the Standby state as indicated by the STANDBY
LED being lit.
4. Press the LCL/RMT pushbutton on the front panel until REMOTE appears in the upper left
corner of the display. (This indicates that the Remote Control Panel can now control the
CHPA.)
5. Perform tests at the Remote Control Panel to confirm that it not only has complete control of
the CHPA but that it has complete monitoring capabilities of all of the metering available on
the front panel.
6. If no more options are to be tested, switch off the main power to the CHPA, remove the RF
Input and Output test loads, and make the normal RF Input and RF Output connections.
4-10
THIS DOCUMENT IS THE PROPERTY OF COMMUNICATIONS & POWER INDUSTRIES.
REPRODUCTION OR RELEASE WITHOUT EXPRESS PERMISSION IS STRICTLY PROHIBITED
D
.01023245 R
.L
OC
EV

Advertisement

Table of Contents
loading

Table of Contents