Chapter 2 Unpacking And Installation; Overview; Pre-Inspection; Unpacking - CPI Satcom Division VZU-6997 Series Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

CHPA SERIES
2-1
Chapter 2
Unpacking and Installation

2.1 Overview

This chapter contains instructions for site preparation, unpacking, and installation of the
Compact High Power Amplifier (CHPA). Instructions for the optional CHPA Remote Control
and Switching/Power Combined subsystems are supplied separately with those items. The
CHPA's built-in interface connections for optional equipment are described in Chapter 3,
"Interfaces," of this manual.

2.2 Pre-Inspection

Inspect the exterior of each for evidence of damage in shipment. If damage seems evident,
immediately contact the carrier that delivered the equipment and submit a damage report.
Failure to do so could invalidate future claims.

2.3 Unpacking

Carefully unpack and remove all items (inspect the interior of the container for damage). Save
all packing material until all inspections are complete. It is recommended that all packing
material be saved for potential future use. Verify that all items listed on the packing slips have
been received.
Inspect all items for evidence of damage in shipment. If damage seems evident, immediately
contact the carrier that delivered the equipment and file a claim. Failure to do so could
invalidate future claims. Check the unit thoroughly for damaged or loose parts. To remove the
top cover of the unit, remove the screws around the sides of the cover and lift the cover off.
After visual inspection is complete, reinstall the cover and carefully tighten all screws.
THIS DOCUMENT IS THE PROPERTY OF COMMUNICATIONS & POWER INDUSTRIES.
D
.01023245 R
.L
OC
EV
2-1
REPRODUCTION OR RELEASE WITHOUT EXPRESS PERMISSION IS STRICTLY PROHIBITED

Advertisement

Table of Contents
loading

Table of Contents