Install The Drive, Elevation Actuator & Torque Tube - Wattsun AZ-225 Installation Manual

Dual-axis, azimuth drive solar tracker
Table of Contents

Advertisement

Section
Install the Elevation Actuator & Torque Tube
3
(Most trackers are shipped from the factory with the lower fork extensions installed. Check the bolts to
make sure that they did not loosen in transit.)
WARNING!
The AZ-225 Drive weighs from 170 to 220 pounds!
Do not use the Azimuth motor or tracker controller as
"lift handles." You will damage the motor gearing or
tracker controller if you put any unusual force on
them.
You will have to be able to lift the AZ-225 Drive up, over
and down on top of your mounting pole. Placing the drive
on top of the pipe is at least a "two person" job. The drive
is much easier to set using a boom and pulley
arrangement or suspending it from a backhoe bucket or
other appropriate method.
Make sure that the drive "seats" completely over the pipe.
Back out the 4 set bolts and set aside if necessary to
make sure that they do no catch on the top of the pipe.
The 4 "cup point" set bolts "dig and cut" in to the steel
pipe. Tighten the set bolts so that they put strong and
equal pressure on the pipe mast. Each bolt should
"show" an equal amount of thread when you are finished
.
Each set bolt should be tightened to 80 Ft-Lbs of
torque
.
8