Installation Of The Tracker Pipe Mast And Foundation - Wattsun AZ-225 Installation Manual

Dual-axis, azimuth drive solar tracker
Table of Contents

Advertisement

Section
1
WARNING! WINDY CONDITIONS CAN EXERT EXTREME FORCES ON THE ARRAY, FOUNDATION,
AND PIPE MAST OF YOUR TRACKER.
1.1) Choose an optimum solar location to install the PV array for in the ground mounting. The location should be
free from obstructions. Keep in mind that over a period of time, that trees, shrubs, etc. may grow enough to
obscure the PV array from the sun. Consult with your dealer for proper tracker spacing and alignment
regarding multiple tracker installations.
1.2) Dig an appropriate sized hole for your tracker's foundation using a shovel, auger, or backhoe. The variables
that affect the design of the foundation include: tracker size, pipe mast height, soil conditions, geographical
location, weather and local building codes. Employ a qualified professional to design the foundation for your
tracker.
1.3) A general rule of thumb is to have an equal amount of pipe underground as above the ground and a three-foot
diameter reinforced concrete foundation. Please have a professional design the size and type of foundation
required!
1.4) Use the appropriate length of 8" ID, Schedule 40 Steel Pipe in order to leave the recommended maximum
pipe mast height protruding from ground. Consult your specific Wattsun Technical Data Sheet for the
appropriate mast height and pipe diameter size. Note: If the recommended pipe mast height is exceeded, it
may be necessary to telescope a larger diameter pipe in the lower portion and increase the foundation size in
order to withstand the increased forces exerted during windy conditions.
1.5) Cut at least two pieces of re-bar or steel angle (more with 8 module or larger trackers), at lengths equal to the
full diameter of the foundation. Weld re-bar onto (or drill holes and insert re-bar into) the underground portion
of the pipe so that the pieces of re-bar form an 'x' pattern that remains parallel to the ground. When the
tracker pipe mast is completely installed, the re-bar will be perpendicular to the pipe and parallel to the ground
and protrudes radially outward into the concrete foundation. The re-bar acts as an "anti-rotation" device and
will keep the pipe from spinning in the hole if the concrete shrinks back from the pipe.
1.6) Set the pipe into the hole and pour concrete around the pipe until it completely fills the hole. Also pour
concrete into the pipe to secure the re-bar inserted in the bottom portion of pipe. Make certain the pipe is
vertically plumb and allow concrete to set for at least 24 hours. If you fill the entire pipe mast with concrete,
leave at least one foot of hollow pipe at top for azimuth drive assembly clearance.
Array Technologies, Inc. assumes no liability for your foundation installation.
Please consult with a local professional or your Wattsun Solar Tracker Dealer.
nstallation of Tracker Pipe Mast and Foundation
I
SIMPLIFIED TRACKER FOUNDATION DIAGRAM
(Using recommended mast height from your Technical Data Sheet)
5