Periodic Maintenance - Wattsun AZ-225 Installation Manual

Dual-axis, azimuth drive solar tracker
Table of Contents

Advertisement

Section
11

12) PERIODIC MAINTENANCE

Maintenance should be performed at least once a year. More often if your tracker is installed in severe
weather areas.
Inspect all the tracker hardware and the module bolts for tightness. Tighten all nuts and bolts that need it.
Inspect all wires for abrasion and gently tug on them to make sure that they are secure.
Each of the four grease zerks should receive 4-6 pumps of lithium-base general-purpose chassis grease from
a grease gun.
Elevation Actuator: Spray the inner tube (telescoping part) of the linear actuator with a lubricating rust inhibitor.
(We use LPS-3)
NOTE:
YOUR AZ-225 GEAR DIVE MAY HAVE THE 4
HOUSING RATHER THAN THE TOP AS SHOWN IN THE PICTURE.
Periodic Maintenance
th
GREASE ZERK LOCATED ON THE BOTTOM OF THE GEAR
33

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Wattsun AZ-225

Table of Contents