Generac Power Systems PWRcell X7602 Installation Manual page 41

Hide thumbs Also See for PWRcell X7602:
Table of Contents

Advertisement

Figure 6-31. Export Limit
NOTE: This feature is only available for inverter firm-
ware version 13290 or greater. See
Software Version
for more details. To request a firm-
ware update for an inverter, please contact PWRcell
Technical Support.
Setting Inverter Grid Compliance
NOTE: The inverter must be disabled before changing
utility compliance settings. Before disabling inverter,
ensure that all REbus devices have first been disabled.
Compliance settings changes will not be applied if
inverter is enabled.
1. To set an inverter to comply with a utility's require-
ments, navigate to the drop-down menu in the
upper right-hand corner of the Installer Configura-
tion Tool home page and select Inverter from the
drop-down menu.
2. See
Figure 6-32
Click on Utility Compliance Con-
figuration and select the appropriate utility compli-
ance standard from the menu at the bottom of the
page. Click Submit to apply the compliance stan-
dard. The settings entered will not take effect until
the Submit button has been clicked.
Installation Manual for Generac PWRCell Inverter
NOTE: Verify the Compliance Selection field shows the
desired compliance rule after clicking Submit.
011686
NOTE: For multi-system sites, compliance must be set
on each inverter separately through each respective Bea-
con.
Verifying Inverter
Proof of Compliance
See
whether the system has been set up to conform to a util-
ity compliance ruleset. Please double check that the sys-
tem is configured properly by observing the 'In
compliance with' line in the PDF. If your utility requires
proof of correct configuration, save this PDF and send it
to your utility. It is recommend that you keep a copy on
file as well.
Figure 6-32. Utility Compliance Configuration
6-33. The Compliance PDF validates
Figure
1. To generate a proof of compliance PDF, click on
the Compliance PDF tab in the navigation menu.
2. Click on Download Report.
3. A new window will open in the browser with the
report. Verify information is correct and save the
document or send via email.
Figure 6-33. Proof of Compliance
Commissioning and Setup
010983
010984
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwrcell x11402Pwrcell apke00013

Table of Contents