3 Installation Site Preparations:
3.1 Tool List:
(1) Screws*
(3) Philips screwdriver
(5) Wire stripper
(7) Electric drill
(9) BNC connector
*Included in the kit
3.2 Installation Preparation:
(1) Check the space and toughness of the site and make sure that the
environmental conditions meet the installation requirements for this product.
(2) The installation surface should be able to bear 4 times the weight of the
PTZ and its accessories.
3.3 DIP Switch Setting:
(1)Default Settings: Pelco-D, baud rate: 2400, address: 1.
(2)Baud Rate Setup
(3) Hardware Address Setup*: Please refer to Appendix I.
MZ-10A-2(IR) User Manual
(2) Monkey wrench
(4) Straight Screwdriver
(6) Socket head wrench
(8) Hammer
(10) BNC Clamp
8