Download Print this page

Speakman S-1495-AF Instructions page 2

Advertisement

9
The Handle and Dial Cap must be removed to adjust the Temperature Limit Stop. Remove the Handle Screw (1), then slide the Handle (2) off. Remove the Dial Cap Screw (3) followed by sliding off the Dial Cap (4).
3/32"
10
BACK-TO-BACK INSTALLATION
Your Shower Valve has the ability to be mounted back-to-back with another Valve in a shared space. This means the HOT
and COLD inlets may be reversed. Please see the following steps to adapt your valve for back-to-back mounting or
reversed inlet supplies.
If the HOT and COLD water supplies are reversed (HOT on right and COLD on left), disassemble Valve Cartridge as
outlined in STEP 11.
Please proceed to
STEP 11.
Reverse
Installation
H
Normal Installation
(shown without Bonnet)
NOTE: Never install the valve body upside down!
12
TEMPERATURE LIMIT ADJUSTMENT
The maximum outlet temperature setting adjustment
(Temperature Limit Stop (TLS)) of the Valve has been
factory set at 110° F. To adjust the limit of the maximum
outlet temperature the Valve delivers, adjust the Valve's
temperature limit stop (TLS) Plate.
• Slip the Retaining Clip away from the Spindle and the
TLS Plate towards the end of the Spindle.
• With the water supplies "On", rotate the Valve
Spindle clockwise to the maximum desired outlet
temperature.
• Position the TLS Plate so it contacts the Lug on the
Bonnet and therefore restricts the clockwise rotation of
the Spindle.
• Slip the Retaining Clip back into the groove of the
Spindle to hold the TLS plate in place.
• Rotate the Spindle counter-clockwise to the "Off"
position.
NOTE: A thermometer can be held at the Valve outlet to aid in either checking the existing factory setting
or reaching the desired outlet temperature.
HANDLE AND DIAL CAP REMOVAL
Normal Installation
(changes not required)
C
Reverse Installation
(shown without Bonnet)
BONNET LUG
TLS PLATE
CLIP
11
VALVE CARTRIDGE ADJUSTMENT/RE-INSTALLATION
Ensure that the water supplies are turned "OFF". Adjust the Cartridge Assembly by following the
steps below.
• Gently remove the Retaining Clip ❶ and TLS Plate ❷ and keep them aside for later use.
• Using a Phillips Head Screwdriver, remove the four (x4) Bonnet Screws ❸.
• Pull out the Cartridge assembly from the Valve Body.
• Using a Flat Tip Screwdriver, separate the Bonnet ❹ from the Cartridge Housing ❻ by gently
prying between the Flange of the Bonnet ❹ and Cartridge Housing ❻ to release the engagement.
• Pull out the Cartridge ❺ from the Housing ❻.
• Rotate the Cartridge ❺ 180º so the "H" is now present at the 3 o'clock position.
• Insert the Cartridge ❺ into the Cartridge Housing ❻.
• Position the Bonnet ❹ over the Cartridge ❺ and snap the Bonnet ❹ into the Cartridge Housing
❻ while aligning the tabs and slots accordingly.
• Reinstall the Cartridge Assembly into the Valve Body while ensuring the Large O-Ring ❼ is
properly seated.
• Secure the Cartridge Assembly with the four (x4) Bonnet Screws ❸.
• See STEP 12 for TLS Adjustment and re-installation of the TLS Plate ❷ and Retaining Clip ❶.
13
HANDLE AND DIAL CAP INSTALLATION
Slide on the Dial Cap (1) onto the Bonnet. Tighten in place with the Dial Cap Screw (2). Slide the Handle (3)
onto the Valve post. Then secure into position with Handle Screw (4).
3/32"
If you are performing a
If you are performing a
Back-to-Back
Standard Installation,
Installation, please
please proceed to
proceed to STEP 10.
STEP 12.
ROTATE
180˚

Advertisement

loading

This manual is also suitable for:

S-1497-lh