Download Print this page

Bison PR98GHT Instruction Manual page 3

6” hangtime ez swing up pole system

Advertisement

6. Remove the plugs from the threaded holes in the Ground
Anchor (A). Unpack the Pole (B) and Crank (E). Align
the hinge tabs on the Pole (B) with the hinge tube on the
Ground Anchor (A). Insert the 1/2" X 6 1/2" Hex Bolt
(I) through the hinge tabs. Install the 1/2"-13 Deformed
Lock Nut (J) and tighten it before backing off 1/2 turn or
until Pole (B) can swivel on the Ground Anchor (A).
See Figure 4.
7. Lift Pole (B) to approximately 45° and install the 3/4" X
7" Hex Bolt (K) through the slot in the back of the Pole
(B) bottom plate and then through the slot in the back of
the Ground Anchor (A) top plate. Hand tighten a
3/4"Hex Nut (L) onto the 3/4" X 7" Hex Bolt (K). Make sure to tighten the 3/4" Hex Nut (L) onto the
3/4" X 7" Hex Bolt (K) until you see threads on the other side of the nut. See Figures 5 & 6.
The 3/4" X 7" Hex Bolt (K) and 3/4" Hex Nut (L) MUST remain in place until Pole (B) is raised and
8. Lift the Lower Arm (C) over the top of the Pole (B). Align the holes in the Lower Arm (C) with the lower
holes in the Pole (B). Attach the Lower Arm (C) to the Pole (B) with a 5/8" X 12" Hex Bolt (O) and a
5/8" Lock Nut (P). Tighten then back off 1/2 turn. Lower Arm (C) must pivot freely. See Figure 7.
Important!
bolted to the Ground Anchor (A) top plate.
Figure 5
3
Figure 7
Figure 4
Figure 6

Advertisement

loading

This manual is also suitable for:

Pr98ghtjrPr98shtPr98sxlhtPr98uhtPr98uhtjrHt6060g ... Show all