Maintenance; Drain In Place; Decontamination Process - Graco WHITE KNIGHT PCA300 Owner's Manual

Table of Contents

Advertisement

Maintenance

7.1. Drain in Place

Pump can be installed with drain and air hoses to enable drain and dry sequence during process or before pump
is uninstalled from tool.
Attach drain tube. Add
valve to control drain.

7.2. Decontamination Process

PRINT COMPLETED DECONTAMINATION CERTIFICATION. IT MUST BE INCLUDED IN YOUR RMA
SHIPMENT.
White Knight products are designed for use with caustic and otherwise dangerous liquids. Handle every
product as if it contains dangerous chemicals whether or not it actually does.
Only those with adequate safety training should attempt to handle used pumps.
Wear adequate safety gear appropriate for chemicals that have been in the pump.
Review relevant Material Safety Data Sheets (MSDS) before handling the pump.
Review emergency numbers for use in event of an accident.
Prepare Ph papers, showers, antidotes, clean-up equipment, neutralizers, and other safety devices used
to detect. Neutralize or minimize effects of chemicals described in appropriate MSDS documents.
7.2.1. Rinse with DI Water
Circulate DI water through pump for twenty minutes before disassembly and/or double bagging for shipment. If
pump is nonfunctional, force minimum 10 lpm DI water from inlet to outlet for 40 minutes before shipment
preparations.
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Copyright © 2021 White Knight Fluid Handling | A Graco company
187 E. 670 S., Kamas, UT 84036
435.783.6040 888.796.2476
Attach tube for
compressed air. Add valve
to control application of
compressed air.
Version 1.0.1 | 3 December 2021 | Page 33

Advertisement

Table of Contents
loading

Table of Contents