3.1
UTILITY REQUIREMENTS
Utility
System Power:
Maximum Pressure
Heater Weight:
(Approximate)
3.2
UNPACKING
The system should be checked for any damage that may have occurred during
shipment. Damage should be reported to the carrier immediately.
The following items should be contained within the shipping container:
QTY.
3.3
ORIENTATION
The heater must be positioned within 15° of vertical. Horizontal mounting will
reduce heater life and void warranty. The heater should be installed so that the
weight of the heater is either supported by the heater mounting bracket or other
system that prevents the support of the heater on the plumbing.
3.4
FLUID CONNECTIONS
3.4.a Inlet & Outlet
•
Attach the inlet and outlet fluid connections following the fitting
manufacturer's procedures. Fluid connections are located at the bottom
(inlet) and top (outlet) of the heater, see Figure 3-1.
•
Verify flow direction.
•
Trebor recommends repeating at least 2 thermal cycles with DI water to
check for leaks before putting the unit into service.
3.5
ELECTRICAL CONNECTIONS
Connection of required electrical hook-ups is required between the heater and
control system. See Section 7 for wiring instructions.
MODEL IDH OPERATION / MAINTENANCE MANUAL
•
3ea - 6kW 400 Vac 50/60 Hz, 3Ø, 30 Amp Service
•
0.55 MPa (80 psig)
•
11kg (24.25lbs)
DESCRIPTION
1
Inline DI Heater / Optional Accessories
1
Operation / Maintenance Manual
Inline DI Heater
PAGE 9